Before I ran a healthcare staffing agency, I worked as a project manager. One of the first concepts you learn in that world is the critical path: the sequence of tasks that determines the shortest possible time a project can take, because none of those specific tasks can slip without delaying everything downstream. Other tasks might have some flexibility in timing. Critical path tasks don’t.

I think about credentialing the same way now.

It’s tempting to treat credentialing as paperwork, a background process running alongside the “real” work of matching a professional to a facility’s needs. I don’t see it that way anymore. In my experience, credentialing is the critical path of healthcare staffing, and when a step in that process slips, even by a few days, I’ve watched the effects ripple through the entire placement.

Why credentialing sits on the critical path

A placement can’t move forward until credentialing is complete. It doesn’t matter how well I’ve matched a professional to a facility’s needs, how much availability they have, or how ready everyone else is. Until license verification, background checks, required certifications, and facility-specific requirements are confirmed, the placement simply can’t start.

That’s what makes credentialing different from other parts of the process I manage. Building a candidate pool, communicating with a facility, or preparing onboarding materials can often happen with some flexibility in timing. Credentialing can’t. It has to be complete before the placement date, and every day it takes pushes the earliest possible start date back by the same amount.

What I’ve seen happen when credentialing slips

A delay rarely stays isolated. A few patterns I’ve watched play out:

None of this happens because anyone did their job poorly. It happens because credentialing sits on the critical path, and critical path delays don’t stay contained. That’s a lesson I carried directly from project management into how I run this agency.

How I try to treat credentialing like the critical path task it is

A few practical shifts follow from recognizing credentialing’s role in the timeline, and they’re things I actively work to apply here.

I try to start credentialing as early as possible, not after a match is confirmed. Waiting to begin credentialing until a specific placement is lined up adds unnecessary time to the critical path. Where I can, I try to get credentialing that isn’t facility-specific started as soon as a professional joins our roster, rather than after a placement opportunity appears.

I try to know what’s actually facility-specific versus universal. Some credentialing requirements are standard across placements. Others are specific to a particular facility. Knowing which is which in advance means less has to happen inside the tighter window once a placement is identified.

I try to build in realistic lead time, and communicate it clearly. If a facility has an urgent need, I think it helps for them to understand upfront what the realistic credentialing timeline looks like, rather than assuming a placement can move as fast as an already-credentialed professional’s availability might suggest.

I track credentialing status the way I’d track any critical path task. In project management, critical path tasks get closer monitoring than tasks with more flexibility. I try to give credentialing that same attention. Knowing exactly where each credentialing step stands, and flagging anything at risk of slipping, is how I try to catch delays before they cascade into a missed placement.

I try to have a plan for what happens when a delay is unavoidable. Not every credentialing delay can be prevented. Verification bodies, background check turnaround times, and licensing boards all introduce factors outside my direct control. What I can control is communicating a delay as soon as I know about it, rather than after it’s already affected the placement date. That alone limits the damage, even when the delay itself couldn’t be avoided.

The bigger point

Credentialing often gets treated as a background process, something that happens alongside the real work of staffing. I’ve learned, both as a project manager and now running this agency, that recognizing it as the critical path changes how it needs to be managed. It’s not a task with flexibility to spare. It’s the task that determines how fast everything else can move.

I try to give credentialing the urgency and attention a critical path task deserves, because in my experience, that’s what makes the difference between consistently delivering on placement timelines and constantly explaining why one didn’t come together.


If your facility has experienced placement delays tied to credentialing timelines, I’d welcome the conversation about how we approach this process.